CROW WING TOWNSHIP

Land Use Application Form
HOME
AGENDAS
TOWNSHIP ROADS
CURRENT NEWS & PUBLIC NOTICES
TOWN BOARD OFFICERS
RECENT TOWN BOARD/PLANNING COMMISSION MEETING MINUTES
PLANNING & ZONING
BOARD MEETING SCHEDULE
TOWN HALL/PARK RENTAL
OAKLAND CEMETERY
BARROWS COMMUNITY PARK
RECYCLING PROGRAM

CROW WING TOWNSHIP LAND USE APPLICATION

APPLICATION:

A. Applicant shall complete Land Use Application and submit to the Zoning Administrator.

B. Application shall be accompanied by a site plan drawing that is complete with the following minimum information (as close to scale as possible):

- Size of parcel

- Location on the parcel of all existing structures, their square footage and distance from all property lines, setbacks (including road, bluff, and shoreline) and each other

- Location on the parcel of all proposed structures and their square footage, distance from all property lines, setbacks (including road, bluff, and shoreline) and each other

- Location on the parcel of existing and proposed sewage treatment systems and wells and their distance from property lines, structures and each other

- Existing and/or proposed square footage of the driveway (gravel and paved), access roads, parking, sidewalks

***If a new driveway in being construction from a Township road, please contact the Township Roads Supervisor, David Shultz, at (218) 839-1215 for an entry permit***

C. Application shall include drawings showing number of bedrooms in the structure.

D. Application shall include elevation drawings showing proposed structure height.

E. Application shall include Sewer Compliance Inspection certificate.

F. Applicant shall include the signature of the title owner of the property.

REVIEW:

A. The Planning and Zoning Administrator shall review the application for completeness and assign a reference number to application, plans, and any other attachments. Staff will indicate on the application the date that the application is complete. The applicant will be notified where additional information is needed.

B. The Staff shall, based on submittals, compute the Land Use Permit Fee. This fee shall be paid by the applicant at the time the application is submitted.

ACTION:

In order to obtain a Land Use Permit, the following must happen:

A. The Zoning Administrator must review and approve the Sewer Compliance Inspection report.

B. The Township Clerk must verify all current billings and insure that the applicant is current on all payments.

C. The Zoning Administrator must insure that the permit fee has been collected.

D. The Zoning Administrator must insure that the proposed improvements meet the requirements of the Ordinance.

PLEASE NOTE: The Township has 60 days in which to review and make a decision on land use applications, although the Township strives to process all applications as soon as they are received. To avoid delays, applicants should allow themselves as much time as possible between the time they submit their application and the time they wish to begin construction. Close coordination with the Township Staff during the project design phase and submittals that are complete and accurate will help applicants avoid delays. No construction can begin until the permit is complete and approved.

REVISED: May 2015

CROW WING TOWNSHIP

LAND USE PERMIT APPLICATION

Name of Applicant Phone ________________________

Property Address (E911#) Local Phone ___________________

Mailing Address Email ________________________

City, State, Zip ___________________________________________________________

Applicant is: Title Holder of Property: (if not applicant)

Legal Owner ( )

Contract Buyer ( ) (Name)

Option Holder ( )

Agent ( ) (Address)

Other _______________________________

(City, State, Zip)

Signature of Owner, authorizing application (required):

(By signing the owner is certifying that they have read and understood the instructions accompanying this application.)

Signature of Applicant (if different than owner):

(By signing the applicant is certifying that they have read and understood the instructions accompanying this application.)

Property Parcel ID (15 Digit # on Tax Statement) _________

Zoning District

Will an address assignment (E911#) be needed?

State nature of request in detail: (What are you proposing for the property? If a new structure, indicate height and foundation type.)

Approved by the Zoning Administrator: ____________________________Date:_______________

APP #________

Date _______ Fee_______

(for office use only)

REVISED

Enter content here

Enter content here

Enter supporting content here